Skip to content

CETCO Corflex methane barrier inspection successful at Cedars-Sinai Medical Center new construction

October 18, 2011

This past summer was full of inspection activities for the Terra-Petra team. The latest being the inspection of the CETCO Coreflex methane barrier and waterproofing system installation at the subslab walls at the Cedars-Sinai Medical Center’s Advanced Health Science Pavilion in Los Angeles.  Cedar’s Advanced Health Science Pavillion is still under construction as we move into the last quarter of 2011.  The Cedar’s inspection was  headed up by Terra-Petra’s Deputy Methane Barrier Inspectors Dan Valdez and Richard McClanahan,

Coreflex at subslab wall with multiple pipe penetrations

Coreflex at wall with pipe penetration

Coreflex at subslab wall

 

Advertisements
No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: