Skip to content

Methane Mitigation System Installation Playa Vista CA

November 27, 2012

Membrane installation has begun at the elevator pit of the Del Rey Apartments in Playa Vista, California. Photos of the installation of the membrane with smoke testing are below. The apartment complex was designed by the Orange, California architectural firm (appropriately named) Architects Orange. Terra-Petra designed the methane mitigation system and is now in the process of providing the required Deputy Methane Barrier Inspections.

ImageImageImage

Advertisements
No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: